Structural Analysis Degree of static indeterminacy of a rigid-jointed plane frame having 15 members, 3 reaction components and 14 joints is 8 9 7 6 8 9 7 6 ANSWER DOWNLOAD EXAMIANS APP
Structural Analysis For stable structures, one of the important properties of flexibility and stiffness matrices is that the elements on the main diagonal(i) Of a stiffness matrix must be positive(ii) Of a stiffness matrix must be negative(iii) Of a flexibility matrix must be positive(iv) Of a flexibility matrix must be negativeThe correct answer is (i) and (iii) (ii) and (iv) (i) and (iv) (ii) and (iii) (i) and (iii) (ii) and (iv) (i) and (iv) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Structural Analysis Independent displacement components at each joint of a rigid-jointed plane frame are two linear movements and one rotation one linear movement and two rotations three linear movements three rotations two linear movements and one rotation one linear movement and two rotations three linear movements three rotations ANSWER DOWNLOAD EXAMIANS APP
Structural Analysis The effective and actual lengths of a cantilever are same if continuous at the support, Restrained against torsion at the support and free at the end None of these With partial restraint against torsion of the support and free at the end Unstrained against torsion at the support and free at the end Restrained against torsion at the support and free at the end None of these With partial restraint against torsion of the support and free at the end Unstrained against torsion at the support and free at the end ANSWER DOWNLOAD EXAMIANS APP
Structural Analysis In the slope deflection equations, the deformations are considered to be caused byi) bending momentii) shear forceiii) axial forceThe correct answer is only (i) (i), (ii) and (iii) (ii) and (iii) (i)and(ii) only (i) (i), (ii) and (iii) (ii) and (iii) (i)and(ii) ANSWER DOWNLOAD EXAMIANS APP
Structural Analysis For under water concreting. All of these At least 10 percent more cement is required as compared to dry conditions De-watering by pumping is not done or until 24 hours thereafter The volume of coarse aggregates shall not be less than one and half times and not more than twice that of fine aggregate All of these At least 10 percent more cement is required as compared to dry conditions De-watering by pumping is not done or until 24 hours thereafter The volume of coarse aggregates shall not be less than one and half times and not more than twice that of fine aggregate ANSWER DOWNLOAD EXAMIANS APP