Chemical Engineering Plant Economics Which of the following is not a component of depreciation cost? Loss due to obsolescence of the equipment Loss due to decrease in the demand of product Repairs and maintenance cost Loss due to accident/breakdown in the machinery Loss due to obsolescence of the equipment Loss due to decrease in the demand of product Repairs and maintenance cost Loss due to accident/breakdown in the machinery ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Cost incurred towards __________ in a chemical plant is a component of the utilities cost. Property protection Medical services Water supply Running a control laboratory Property protection Medical services Water supply Running a control laboratory ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics A balance sheet for a chemical plant shows its financial condition at any given date. It does not contain the __________ of the plant. Current liability Long term debt Profit Current asset Current liability Long term debt Profit Current asset ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Relative cost of chemical process plants in India is about __________ percent more than the similar plants in U.S.A. 15 55 35 75 15 55 35 75 ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics The amount of simple interest during 'n' interest period is (where, i = interest rate based on the length of one interest period, p = principal) P(1 - i.n) P.i.n. P(1 + i.n) P(1 + i)n P(1 - i.n) P.i.n. P(1 + i.n) P(1 + i)n ANSWER DOWNLOAD EXAMIANS APP