Chemical Engineering Plant Economics A balance sheet for a chemical plant shows its financial condition at any given date. It does not contain the __________ of the plant. Long term debt Current liability Current asset Profit Long term debt Current liability Current asset Profit ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Construction expenses are roughly __________ percent of the total direct cost of the plant. 10 50 2 30 10 50 2 30 ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Which of the following is not a component of the working capital for a chemical process plant? In-process inventory Product inventory Storage facilities Minimum cash reserve In-process inventory Product inventory Storage facilities Minimum cash reserve ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Which of the following is the cheaptest material of construction for the storage of sodium hydroxide upto a concentration of 75%? Copper Stainless steel Plain carbon steel Nickel Copper Stainless steel Plain carbon steel Nickel ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics 'Utilities' in a chemical process plant includes compressed air, steam, water, electrical power, oxygen, acetylene, fuel gases etc. Utility costs for ordinary chemical process plants ranges roughly from __________ percent of the total product cost. 35 to 45 25 to 35 1 to 5 10 to 20 35 to 45 25 to 35 1 to 5 10 to 20 ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics In a manufacturing industry, break even point occurs, when the Total annual rate of production equals the assigned value Annual sales equals the fixed cost Total annual product cost equals the total annual sales Annual profit equals the expected value Total annual rate of production equals the assigned value Annual sales equals the fixed cost Total annual product cost equals the total annual sales Annual profit equals the expected value ANSWER DOWNLOAD EXAMIANS APP