Power Systems Cheapest plant in operation and maintenance is steam power. hydroelectric. nuclear. diesel power. steam power. hydroelectric. nuclear. diesel power. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The specific speed ( NS ) of turbine is given by none of these. P√( N ) / H3/2. N√( P ) / H1.25. N√( P ) / H2/3. none of these. P√( N ) / H3/2. N√( P ) / H1.25. N√( P ) / H2/3. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Condition for zero voltage regulation is tanφ = R/X tanφ = X/R cosφ = R/X cosφ = X/R tanφ = R/X tanφ = X/R cosφ = R/X cosφ = X/R ANSWER DOWNLOAD EXAMIANS APP
Power Systems The receiving end voltage for a long line under no load condition is more than the sending end voltage less than the sending end voltage equal to the sending end voltage any of the above more than the sending end voltage less than the sending end voltage equal to the sending end voltage any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows : Ipositive = j1.5 pu, Inegative = − j0.5 pu, Izero = − j pu Which fault is this? LL. LLLG. LG. LLG. LL. LLLG. LG. LLG. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants both operating and initial cost are high. operating cost is high and initial cost is low. operating cost is low and initial cost is high. both operating and initial cost are low. both operating and initial cost are high. operating cost is high and initial cost is low. operating cost is low and initial cost is high. both operating and initial cost are low. ANSWER DOWNLOAD EXAMIANS APP