Irrigation Engineering Borrow pits should preferably be located in Field on the left side of the canal Fields on both sides of the canal Field on the right side of the canal Central half width of the section of the canal Field on the left side of the canal Fields on both sides of the canal Field on the right side of the canal Central half width of the section of the canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Groynes are generally built Inclined downstream up to 30° Inclined up stream up to 30° Perpendicular to the bank All listed here Inclined downstream up to 30° Inclined up stream up to 30° Perpendicular to the bank All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For a proportional outlet, the flexibility is zero between zero and 1 greater than 1 1 zero between zero and 1 greater than 1 1 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable section of a lined canal, is Both (a) and (b) Trapezoidal section with rounded corners for large canals Triangular section with circular bottom for small canals None of these Both (a) and (b) Trapezoidal section with rounded corners for large canals Triangular section with circular bottom for small canals None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a chute spillway, the flow is usually critical super critical subcritical uniform critical super critical subcritical uniform ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering According to Lacey, in regime conditions Silt is kept in suspension by vertical components of eddies Neither (a) nor (b) Both (a) and (b) Entire cross-section of the channel is generated at all points by the forces normal to the Silt is kept in suspension by vertical components of eddies Neither (a) nor (b) Both (a) and (b) Entire cross-section of the channel is generated at all points by the forces normal to the ANSWER DOWNLOAD EXAMIANS APP