Borrow pits should preferably be located in

Field on the right side of the canal
Field on the left side of the canal
Central half width of the section of the canal
Fields on both sides of the canal

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
A counter berm is

A horizontal benching provided on the outside slope
A horizontal benching provided on the inside slope
A vertical benching provided on the inner edge of the bank
A vertical benching provided on the outer edge of the bank