Irrigation Engineering Cyclonic precipitation is caused by lifting of an air mass due to All of these natural topographical barriers pressure difference temperature difference All of these natural topographical barriers pressure difference temperature difference ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be syphon syphon aqueduct aqueduct superpassage syphon syphon aqueduct aqueduct superpassage ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Instantaneous unit hydrograph is a hydrograph ofi) unit durationii) unit rainfall excessiii) infinitely small durationiv) infinitely small rainfall excessThe correct answer is (i)and(iv) (iii) and (iv) (ii) and (iii) (i) and (ii) (i)and(iv) (iii) and (iv) (ii) and (iii) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The shape of recession limb of a hydrograph depends upon Storm characteristics only Basin characteristics only None of these Both (A) and (B) Storm characteristics only Basin characteristics only None of these Both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering S-hydrograph is used to obtain unit hydrograph of longer duration from shorter duration None of these shorter duration from longer duration both (A) and (B) longer duration from shorter duration None of these shorter duration from longer duration both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Silt excluders are constructed on the river bed upstream of head regulator canal bed downstream of head regulator canal bed upstream of head regulator river bed downstream of head regulator river bed upstream of head regulator canal bed downstream of head regulator canal bed upstream of head regulator river bed downstream of head regulator ANSWER DOWNLOAD EXAMIANS APP