Industrial Engineering and Production Management Basic motion time study gives times for basic motions in ten thousandths of Hour Day Second Minute Hour Day Second Minute ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management An event is indicated on the network by A straight line with circles at the ends A dotted line A straight line A number enclosed in a circle or a square A straight line with circles at the ends A dotted line A straight line A number enclosed in a circle or a square ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following conditions are necessary for applying linear programming? The decision variables should be interrelated and nonnegative. These must be a well defined objective function. All of these The resources must be in limited supply. The decision variables should be interrelated and nonnegative. These must be a well defined objective function. All of these The resources must be in limited supply. ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The important file in making a PERT is All of the these No activity from any event can be started from preceding event till it is completed Length of arrow has nothing to do with time An event can't be accomplished until activities leading to it are completed All of the these No activity from any event can be started from preceding event till it is completed Length of arrow has nothing to do with time An event can't be accomplished until activities leading to it are completed ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Material handling and plant location is analysed by Travel chart Gantt chart Emerson chart Bin chart Travel chart Gantt chart Emerson chart Bin chart ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Standard time is equal to Representative time multiplied by rating factor (Normal time) - (allowances) (Normal time) + (allowances) Normal time taken by an operation Representative time multiplied by rating factor (Normal time) - (allowances) (Normal time) + (allowances) Normal time taken by an operation ANSWER DOWNLOAD EXAMIANS APP