Power Systems An isolated synchronous generator with transient reactance equal to 0.1 pu on a 100 MVA base is connected to the high voltage bus through a step up transformer of reactance 0.1 pu on a 100 MVA base. The fault level at the bus is 400 MVA 100 MVA 500 MVA 200 MVA 400 MVA 100 MVA 500 MVA 200 MVA ANSWER DOWNLOAD EXAMIANS APP
Power Systems The most suitable circuit breaker for short line fault without switching resistor is none of these. air blast circuit breaker. oil circuit breaker. SF6 breaker. none of these. air blast circuit breaker. oil circuit breaker. SF6 breaker. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Gross head of an hydroelectric power station is the height of water level in the river where the storage is provided. the height of water level in the river where the tail race is provided. the difference of water level between the level in storage and tail race. all of above. the height of water level in the river where the storage is provided. the height of water level in the river where the tail race is provided. the difference of water level between the level in storage and tail race. all of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the percentage reactance of an element is 20 % and the full load current is 50 Amp, the short circuit current will be 250 Amp. 300 Amp. 200 Amp. 350 Amp. 250 Amp. 300 Amp. 200 Amp. 350 Amp. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical mass of the fuel is the amount required to make the multiplication factor equal to factor. 0.5. less than 1. more than 1. equal to factor. 0.5. less than 1. more than 1. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Steady state stability of a power system is improved by All of these decreasing generator inertia using double circuit line instead of single circuit line single pole switching All of these decreasing generator inertia using double circuit line instead of single circuit line single pole switching ANSWER DOWNLOAD EXAMIANS APP