Airport Engineering An airport has 4 gates. If the weighted average gate occupancy time is 30 minutes and gate utilization factor is 0.5, then the capacity of the gate will be 16 aircrafts per hour 2 aircrafts per hour 4 aircrafts per hour 1 aircraft per hour 16 aircrafts per hour 2 aircrafts per hour 4 aircrafts per hour 1 aircraft per hour ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The capacity of parallel runway pattern depends upon Lateral spacing between two runways, weather conditions and navigational aids available. Lateral spacing between two runways and weather conditions Weather conditions and navigational aids available Lateral spacing between two runways and navigational aids available Lateral spacing between two runways, weather conditions and navigational aids available. Lateral spacing between two runways and weather conditions Weather conditions and navigational aids available Lateral spacing between two runways and navigational aids available ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering In an airport, if 4 groups of 5 gates each located well separated are considered for traffic and the future to present traffic ratio is 3, then the total requirement of future gates will be 32 44 36 68 32 44 36 68 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The bearing of the longest line of a wind rose is S 45° E, the bearing of the runway will be numbered 13 135° Both (C) and (D) 31 13 135° Both (C) and (D) 31 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering For the proposed air port, the survey project provides All listed here Master plan Grading plan Topographic plan All listed here Master plan Grading plan Topographic plan ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The thickness design of the pavement, is decided on the load carried by All listed here Main gears Tail wheel Nose wheel All listed here Main gears Tail wheel Nose wheel ANSWER DOWNLOAD EXAMIANS APP