System Analysis and Design Advantages of data base system is (are) all applications share centralized files storage space duplication is eliminated all of the listed here data are stored once in the data base and are easily accessible when needed all applications share centralized files storage space duplication is eliminated all of the listed here data are stored once in the data base and are easily accessible when needed ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not a requirement of structured design? The code should be executed in a top-to-bottom fashion within each module Each module should be as independent as possible of all other modules, except its parent None of these It should use many GOTO statements It should be made up of a hierarchy of modules The code should be executed in a top-to-bottom fashion within each module Each module should be as independent as possible of all other modules, except its parent None of these It should use many GOTO statements It should be made up of a hierarchy of modules ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The data base be prepared until the computer has been selected None of these the preparation of physical facilities the MIS staff has been acquired and organized All of these the computer has been selected None of these the preparation of physical facilities the MIS staff has been acquired and organized All of these ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Announcement of MIS implementation is made by None of these operational level managers tactical level managers the president All of these None of these operational level managers tactical level managers the president All of these ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not a factor in the failure of the systems developments projects? failure of systems integration size of the company continuation of a project that should have been cancelled inadequate user involvement failure of systems integration size of the company continuation of a project that should have been cancelled inadequate user involvement ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not a factor in the failure of a systems development project ? continuation of a project that should have been cancelled size of company None of these failure of systems integration inadequate user involvement continuation of a project that should have been cancelled size of company None of these failure of systems integration inadequate user involvement ANSWER DOWNLOAD EXAMIANS APP