Concrete Technology and Design of Concrete Structures According to Whitney’s theory, ultimate strain of concrete is assumed to be 0.4% 0.6% 0.3% 0.5% 0.4% 0.6% 0.3% 0.5% ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures The purpose of reinforcement in pre-stressed concrete is To resist tensile stresses To impart initial compressive stress in concrete To provide adequate bond stress All of these To resist tensile stresses To impart initial compressive stress in concrete To provide adequate bond stress All of these ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures In a ring beam subjected to uniformly distributed load i) shear force at mid span is zero ii) shear force at mid span is maximum iii) torsion at mid span is zero iv) torsion at mid span is maximum The correct answer is (i) and (iv) (ii) and (iii) (ii) and (iv) (i) and (iii) (i) and (iv) (ii) and (iii) (ii) and (iv) (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures The depth of footing for an isolated column is governed byi) maximum bending momentii) shear forceiii) punching shearThe correct answer is only (i) (i) and (ii) (i), (ii) and (iii) (i) and (iii) only (i) (i) and (ii) (i), (ii) and (iii) (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures The centroid of compressive force, from the extreme compression fiber, in limit state design lies at a distance of (where xu is the depth of neutral axis at the limit state of collapse) 0.446 xu 0.416 xu 0.573 xu 0.367 xu 0.446 xu 0.416 xu 0.573 xu 0.367 xu ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures For walls, columns and vertical faces of all structural members, the form work is generally removed after 24 to 48 hours 3 days 7 days 14 days 24 to 48 hours 3 days 7 days 14 days ANSWER DOWNLOAD EXAMIANS APP