Concrete Technology and Design of Concrete Structures Shrinkage of concrete depends upon i) humidity of atmosphere ii) passage of time iii) stress The correct answer is All (i), (ii) and (iii) only (iii) (ii) and (iii) (i) and (ii) All (i), (ii) and (iii) only (iii) (ii) and (iii) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures In counterfort retaining walls, the main reinforcement in the stem at support is Not provided Provided both on inner and front faces Provided only on front face Provided only on inner face Not provided Provided both on inner and front faces Provided only on front face Provided only on inner face ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures The load carrying capacity of a helically reinforced column as compared to that of a tied column is about 5% more 5% less 10% less 10% more 5% more 5% less 10% less 10% more ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures In the design of a front counterfort in a counterfort retaining wall, the main reinforcement is provided on i) bottom face near counterfort ii) top face near counterfort iii) bottom face near centre of span iv) top face near centre of span The correct answer is only (i) both (ii) and (iii) both (i) and (iv) only (ii) only (i) both (ii) and (iii) both (i) and (iv) only (ii) ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Ratio of permissible stress in direct compression and bending compression is less than 1 greater than 2 between 1.5 and 2.0 between 1 and 1.5 less than 1 greater than 2 between 1.5 and 2.0 between 1 and 1.5 ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Select the incorrect statement... Pretensioning system has greater certainty about its durability. None of these The loss of prestress is more in pre-tensioning system than in post-tensioning system. For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system Pretensioning system has greater certainty about its durability. None of these The loss of prestress is more in pre-tensioning system than in post-tensioning system. For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system ANSWER DOWNLOAD EXAMIANS APP