Power Electronics A single phase full bridge inverter can operate in load commutation mode in case load consists of RLC underdamped. RLC overdamped. RL. RLC critically damped. RLC underdamped. RLC overdamped. RL. RLC critically damped. ANSWER DOWNLOAD EXAMIANS APP
Power Electronics Figure shows two thyristors rated 400 A sharing a load current. Current through T2 is 180A. Current through T1 will be 110 A. 100 A. 120 A. 150 A. 110 A. 100 A. 120 A. 150 A. ANSWER DOWNLOAD EXAMIANS APP
Power Electronics A power semiconductor may undergo damage due to Low di/dt. Low dv/dt. High di/dt. High dv/dt. Low di/dt. Low dv/dt. High di/dt. High dv/dt. ANSWER DOWNLOAD EXAMIANS APP
Power Electronics An SCR has half cycle surge current rating of 3000 A for 50 Hz supply. One cycle surge current will be 4242.64 A. 2121.32 A. 6000 A. 1500 A. 4242.64 A. 2121.32 A. 6000 A. 1500 A. ANSWER DOWNLOAD EXAMIANS APP
Power Electronics For an SCR gate cathode characteristic is a straight line of 130. For triggered source volume of 15 V and allowable gate power dissipation of 0.5 W compute the gate source resistance? 108 ohm 115 ohm 111.9 ohm 11.19 ohm 108 ohm 115 ohm 111.9 ohm 11.19 ohm ANSWER DOWNLOAD EXAMIANS APP
Power Electronics Delay time is defined by the interval when anode current reaches 10 % from forward leakage current. all of these. gate current increases from 90 % to 100 % of its final value. anode voltage drops from 100 % to 90 % of its actual value. anode current reaches 10 % from forward leakage current. all of these. gate current increases from 90 % to 100 % of its final value. anode voltage drops from 100 % to 90 % of its actual value. ANSWER DOWNLOAD EXAMIANS APP