Environmental Engineering A sewer that receives the discharge of a number of house sewers is called House sewer Intercepting sewer Lateral sewer Sub-main sewer House sewer Intercepting sewer Lateral sewer Sub-main sewer ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The detention period for oxidation ponds is usually kept as 3 months 48 hours 10 to 15 days 24 hours 3 months 48 hours 10 to 15 days 24 hours ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Residual chlorine in water is determined by Orthotolidine method Starch iodide method Both (A) and (B) None of these Orthotolidine method Starch iodide method Both (A) and (B) None of these ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The main disadvantage of oxidation pond is that None of these Maintenance and operation cost are high BOD removal is very low Large area is required for construction None of these Maintenance and operation cost are high BOD removal is very low Large area is required for construction ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The detention period in coagulation tanks is usually kept as 30 to 45 minutes 2 to 6 hours 1 to 2 minutes 2 to 6 days 30 to 45 minutes 2 to 6 hours 1 to 2 minutes 2 to 6 days ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Which of the following methods of analysis of water distribution system is most suitable for long and narrow pipe system? Circle method Equivalent pipe method Electrical analysis method Hardy cross method Circle method Equivalent pipe method Electrical analysis method Hardy cross method ANSWER DOWNLOAD EXAMIANS APP