DGVCL Exam Paper (12-06-2016) You should choose Sleep option when You are leaving for a very short time and want to resume your work shortly. The computer is tired after working for the whole day. When computer gets hanged frequently. Let it sleep for some time. You finish working and are going to bed. You are leaving for a very short time and want to resume your work shortly. The computer is tired after working for the whole day. When computer gets hanged frequently. Let it sleep for some time. You finish working and are going to bed. ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) The time of closing the cycle, in modern circuit breakers is 0.001 sec. 0.01 sec. 0.003 sec. 0.1 sec. 0.001 sec. 0.01 sec. 0.003 sec. 0.1 sec. ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) The Electricity Act is an Act of _____of India enacted to transform the power sector in India. All of these None of these A State resolution The Parliament All of these None of these A State resolution The Parliament ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) Which of the following 3-phase connection of a transformer causes interference with the neighbouring communication lines: Delta-Delta Star-Delta Delta-Star Star-Star Delta-Delta Star-Delta Delta-Star Star-Star ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) DGVCL is not distributing electricity in _____ district. Valsad Tapi Vadodara Navsari Valsad Tapi Vadodara Navsari ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) The following is a Distribution Company: MGVCL CSERC DERC GERC MGVCL CSERC DERC GERC ANSWER DOWNLOAD EXAMIANS APP