DGVCL Exam Paper (12-06-2016) You should choose Sleep option when You finish working and are going to bed. The computer is tired after working for the whole day. When computer gets hanged frequently. Let it sleep for some time. You are leaving for a very short time and want to resume your work shortly. You finish working and are going to bed. The computer is tired after working for the whole day. When computer gets hanged frequently. Let it sleep for some time. You are leaving for a very short time and want to resume your work shortly. ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) For 11 kV line the capacitance per km per phase will be of the order of: 0.01 microF 1 Farad 0.01 Farad 0.1 Farad 0.01 microF 1 Farad 0.01 Farad 0.1 Farad ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) As per Electricity Act, _____ means any line which is used for carrying electricity for any purpose. All of these Transmission line Electric line None of these All of these Transmission line Electric line None of these ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) _____ electric power is the most common method used by electrical grids to transfer power One-phase Three-phase Two-phase None of these One-phase Three-phase Two-phase None of these ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) With effect from _____ India has adopted a new legislation called the Electricity Act 2003. None of these 3 June 2003 2 May 2003 2 June 2003 None of these 3 June 2003 2 May 2003 2 June 2003 ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) A circuit breaker is designed to protect an electrical circuit from damage caused by : Short circuit All of these Over load Over current Short circuit All of these Over load Over current ANSWER DOWNLOAD EXAMIANS APP