Generation of Electrical Energy

Generation of Electrical Energy
Which of the following power plants need the least period for installation?

Nuclear power plant
Hydroelectric plant
Thermal power plant
Diesel power plant

ANSWER DOWNLOAD EXAMIANS APP

Generation of Electrical Energy
The overall efficiency of thermal power plant is equal to

Regenerative cycle efficiency
Rankine cycle efficiency
Bioler efficiency × turbine efficiency × generator efficiency
Carnot cycle efficiency

ANSWER DOWNLOAD EXAMIANS APP

Generation of Electrical Energy
The diesel power station is generally used as

Peak load plant
Both peak & base load plant
None of these
Base load plant

ANSWER DOWNLOAD EXAMIANS APP

Generation of Electrical Energy
Economiser improve the boiler efficiency by

4 to 10%
10 to 12 %
13 to 15 %
1 to 5 %

ANSWER DOWNLOAD EXAMIANS APP

Generation of Electrical Energy
The isentropic expansion of steam through nozzle for the steam initially dry saturated at inlet is approximated by equation.

pv1A = C
pv = C
pv
pv1i = C

ANSWER DOWNLOAD EXAMIANS APP

Generation of Electrical Energy
Which of the following component, in a steam power plant, needs maximum maintenance attention?

Boiler
Condenser
Water treatment plant
Steam turbine

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Generation of Electrical Energy

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑