Generation of Electrical Energy Which of the following power plants need the least period for installation? Diesel power plant Nuclear power plant Hydroelectric plant Thermal power plant Diesel power plant Nuclear power plant Hydroelectric plant Thermal power plant ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy Economiser improve the boiler efficiency by 4 to 10% 1 to 5 % 13 to 15 % 10 to 12 % 4 to 10% 1 to 5 % 13 to 15 % 10 to 12 % ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy The isentropic expansion of steam through nozzle for the steam initially dry saturated at inlet is approximated by equation. pv1A = C pv pv = C pv1i = C pv1A = C pv pv = C pv1i = C ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy The ideal load factor should be 0.5 1 0.8 0.2 0.5 1 0.8 0.2 ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy The base load power station supplies load _____ in a day 12 hours 24 hours 16 hours 10 hours 12 hours 24 hours 16 hours 10 hours ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy In a power station, diversity factor _______ as we move from consumer to power station None of these Increases Remains same Decreases None of these Increases Remains same Decreases ANSWER DOWNLOAD EXAMIANS APP