Manufacturing And Production Technology Which of the following operation is first performed? Tapping Drilling Boring Spot facing Tapping Drilling Boring Spot facing ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology The rake angle required to machine brass by high speed steel tool is 0° 100° 20° 10° 0° 100° 20° 10° ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology The cutting speed for drilling copper with high speed steel drills varies from 24 to 45 m/min 10 to 20 m/min 60 to 90 m/min 18 to 30 m/min 24 to 45 m/min 10 to 20 m/min 60 to 90 m/min 18 to 30 m/min ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology Two 1 mm thick steel sheets are to be spot welded at a current of 5000 A. Assuming effective resistance to be 200 μm and current flow time of 0.2 second, heat generated during the process will be 1 Joule 5 Joule 0.2 Joule 1000 Joule 1 Joule 5 Joule 0.2 Joule 1000 Joule ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology Which of the following arc welding processes does not use consumable electrodes? GMAW GTAW None of these Submerged Arc Welding GMAW GTAW None of these Submerged Arc Welding ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology In which of the following machine, the work remains stationary and the tool is rotated? Horizontal boring machine Vertical boring machine Jig boring machine Precision boring machine Horizontal boring machine Vertical boring machine Jig boring machine Precision boring machine ANSWER DOWNLOAD EXAMIANS APP