GETCO Exam Paper (30-11-2008)
Which of the following inernational body is associated / collaborating in the National 'Population Education Programme' in the country?
During O.C test obtained no load losses (core loss) During S.C. test obtained copper loss (load losses) during loaded condition of transformer copper loss more significant than core loss.