• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Indian Railway

Indian Railway
When was the construction work for the first Railway line Started?

1821
1830
1828
1823

ANSWER DOWNLOAD EXAMIANS APP

Indian Railway
As per the recent survey conducted by the Quality Council of India, which railway stations have been named as the cleanest and dirtiest railway stations in India?

Allahabad and Indore
Visakhapatnam and Darbhanga
Indore and Visakhapatnam
Darbhanga and Allahabad

ANSWER DOWNLOAD EXAMIANS APP

Indian Railway
In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:

Potential energy
Magnetic energy
Sound energy
Electricity

ANSWER DOWNLOAD EXAMIANS APP

Indian Railway
Between which of the destinations the first Indian train was started?

From Kolkata to Delhi
From Mumbai to Thane
From Mumbai to Madras
From Mumbai to Surat

ANSWER DOWNLOAD EXAMIANS APP

Indian Railway
Launched three Trains to improve Quality of Travel (for reserved passengers), these are:

Sahayak,Antyodaya and Gatiman
Humsafar, Tejas and Uday
Tejas, Antyodaya and Gatiman
Dirubhargh, Sahayak and Humsafar

ANSWER DOWNLOAD EXAMIANS APP

Indian Railway
Indian Railways which is the largest of the Public Sector Enterprises, is divided in how many regions?

7
9
8
10

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Indian Railway

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑