Power Plant Engineering When a reactor becomes critical, then the production of neutrons is Initiated Infinite Zero Exactly balanced by the loss of neutrons through leakage Initiated Infinite Zero Exactly balanced by the loss of neutrons through leakage ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering The incomplete combustion is indicated by present of O2 CO CO2 Water vapour O2 CO CO2 Water vapour ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering Which of the following nuclear reactor does not need a heat exchanger for generation of steam? Pressurised water Gas cooled Liquid metal cooled Boiling water Pressurised water Gas cooled Liquid metal cooled Boiling water ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering In the breeder reactors the generation of new fissionable atom is At the lower rate than the consumption Depends on other considerations At an equal rate of the consumption At a higher rate than the consumption At the lower rate than the consumption Depends on other considerations At an equal rate of the consumption At a higher rate than the consumption ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering Which of the following is more appropriate for a moderator? One which Does not absorb neutrons Eats up neutrons Absorbs neutrons Accelerates neutrons Does not absorb neutrons Eats up neutrons Absorbs neutrons Accelerates neutrons ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering Artificial radioactive isotopes find application in Medical field Nuclear fission Power generation Nucleonic devices Medical field Nuclear fission Power generation Nucleonic devices ANSWER DOWNLOAD EXAMIANS APP