Waste Water Engineering The laying of sewers is done with Level Magnetic compass Clinometer Theodolite Level Magnetic compass Clinometer Theodolite ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which received discharge from two or more main sewers, is known as A main sewer An intercepting sewer A trunk sewer An outfall sewer A main sewer An intercepting sewer A trunk sewer An outfall sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If q is the average sewage flow from a city of population P, the maximum sewage flow Q = [(18 + P)/(4 + )] q Q = [(5 + )/((15 + )] q Q = [(18 + )/(4 + )] q Q = [(4 + )/(18 + )] q Q = [(18 + P)/(4 + )] q Q = [(5 + )/((15 + )] q Q = [(18 + )/(4 + )] q Q = [(4 + )/(18 + )] q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Fresh sewage may become stale in Two to three hours Three to four hours Six hours One hour Two to three hours Three to four hours Six hours One hour ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit and silt of the grit chambers, may not be used for Neither A nor B Raising low lying areas by dumping Concreting Both A and B Neither A nor B Raising low lying areas by dumping Concreting Both A and B ANSWER DOWNLOAD EXAMIANS APP