Waste Water Engineering The laying of sewers is done with Theodolite Clinometer Magnetic compass Level Theodolite Clinometer Magnetic compass Level ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which received discharge from two or more main sewers, is known as An intercepting sewer An outfall sewer A trunk sewer A main sewer An intercepting sewer An outfall sewer A trunk sewer A main sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If q is the average sewage flow from a city of population P, the maximum sewage flow Q = [(18 + P)/(4 + )] q Q = [(18 + )/(4 + )] q Q = [(5 + )/((15 + )] q Q = [(4 + )/(18 + )] q Q = [(18 + P)/(4 + )] q Q = [(18 + )/(4 + )] q Q = [(5 + )/((15 + )] q Q = [(4 + )/(18 + )] q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Fresh sewage may become stale in Three to four hours Two to three hours One hour Six hours Three to four hours Two to three hours One hour Six hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit and silt of the grit chambers, may not be used for Concreting Raising low lying areas by dumping Neither A nor B Both A and B Concreting Raising low lying areas by dumping Neither A nor B Both A and B ANSWER DOWNLOAD EXAMIANS APP