Waste Water Engineering The laying of sewers is done with Magnetic compass Theodolite Level Clinometer Magnetic compass Theodolite Level Clinometer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which received discharge from two or more main sewers, is known as A trunk sewer An outfall sewer An intercepting sewer A main sewer A trunk sewer An outfall sewer An intercepting sewer A main sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If q is the average sewage flow from a city of population P, the maximum sewage flow Q = [(4 + )/(18 + )] q Q = [(18 + P)/(4 + )] q Q = [(18 + )/(4 + )] q Q = [(5 + )/((15 + )] q Q = [(4 + )/(18 + )] q Q = [(18 + P)/(4 + )] q Q = [(18 + )/(4 + )] q Q = [(5 + )/((15 + )] q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Fresh sewage may become stale in One hour Two to three hours Six hours Three to four hours One hour Two to three hours Six hours Three to four hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit and silt of the grit chambers, may not be used for Neither A nor B Both A and B Raising low lying areas by dumping Concreting Neither A nor B Both A and B Raising low lying areas by dumping Concreting ANSWER DOWNLOAD EXAMIANS APP