Waste Water Engineering The laying of sewers is done with Clinometer Level Theodolite Magnetic compass Clinometer Level Theodolite Magnetic compass ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which received discharge from two or more main sewers, is known as A main sewer An intercepting sewer An outfall sewer A trunk sewer A main sewer An intercepting sewer An outfall sewer A trunk sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If q is the average sewage flow from a city of population P, the maximum sewage flow Q = [(4 + )/(18 + )] q Q = [(5 + )/((15 + )] q Q = [(18 + P)/(4 + )] q Q = [(18 + )/(4 + )] q Q = [(4 + )/(18 + )] q Q = [(5 + )/((15 + )] q Q = [(18 + P)/(4 + )] q Q = [(18 + )/(4 + )] q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Fresh sewage may become stale in Six hours Three to four hours One hour Two to three hours Six hours Three to four hours One hour Two to three hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit and silt of the grit chambers, may not be used for Both A and B Raising low lying areas by dumping Concreting Neither A nor B Both A and B Raising low lying areas by dumping Concreting Neither A nor B ANSWER DOWNLOAD EXAMIANS APP