Waste Water Engineering For a continuous flow type of sedimentation tanks Width of the tank is normally kept about 6 m All listed here Maximum horizontal flow velocity is limited to 0.3 m/minute Length of the tank is normally kept 4 to 5 times the width Width of the tank is normally kept about 6 m All listed here Maximum horizontal flow velocity is limited to 0.3 m/minute Length of the tank is normally kept 4 to 5 times the width ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The use of coarse screens for the disposal of sewage, may be dispensed with by Shredder Comminutor Neither A nor B Both A and B Shredder Comminutor Neither A nor B Both A and B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a residential colony, sewers of diameters 100 mm, 150 mm and 225 mm were laid with a gradient 1 in 120. Which portion of the sewage system does not choke in due course of time? 100 mm dia All of these 225 mm dia 150 mm dia 100 mm dia All of these 225 mm dia 150 mm dia ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For trunk sewers more than 1.25 m in diameter, the ratio of the maximum daily sewage flow to the average daily sewage flow is assumed 2.5 1.5 3 2 2.5 1.5 3 2 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For sewer mains of 0.5 to 1 m diameter, the ratio of maximum daily sewage flow to the average daily sewage flow is assumed 1.5 3 2 2.5 1.5 3 2 2.5 ANSWER DOWNLOAD EXAMIANS APP