Manufacturing And Production Technology Two 1 mm thick steel sheets are to be spot welded at a current of 5000 A. Assuming effective resistance to be 200 μm and current flow time of 0.2 second, heat generated during the process will be 1000 Joule 1 Joule 0.2 Joule 5 Joule 1000 Joule 1 Joule 0.2 Joule 5 Joule ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology In which of the following machine, the work is usually rotated while the drill is fed into work? Radial drilling machine Sensitive drilling machine Deep hole drilling machine Gang drilling machine Radial drilling machine Sensitive drilling machine Deep hole drilling machine Gang drilling machine ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology In a milling operation, two side milling cutters are mounted with a desired distance between them so that both sides of a workpiece can be milled simultaneously. This set up is called String milling Gang milling Straddle milling Side milling String milling Gang milling Straddle milling Side milling ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology While current is shut down in the welding circuit, what kind of voltage exists between the output terminals of the welding machine? Open air cut voltage GTAW Gouging Kerf Open air cut voltage GTAW Gouging Kerf ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology In an orthogonal cutting, the depth of cut is halved and the feed rate is double. If the chip thickness ratio is unaffected with the changed cutting conditions, the actual chip thickness will be Quadrupled Unchanged Halved Doubled Quadrupled Unchanged Halved Doubled ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology The main purpose of a boring operation, as compared to drilling, is to Finish the drilled hole Drill a hole Enlarge the existing hole Correct the hole Finish the drilled hole Drill a hole Enlarge the existing hole Correct the hole ANSWER DOWNLOAD EXAMIANS APP