Engineering Drawing These weld symbols have no arrow-side or other-side significance: Projection or seam weld Flash and upset weld Surface or groove weld Back or backing weld Projection or seam weld Flash and upset weld Surface or groove weld Back or backing weld ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing The architectural drafter usually begins a set of working drawings by creating the ________ plan first. Foundation Building section Floor plan Elevations Foundation Building section Floor plan Elevations ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing A drafter who develops technical drawings of a highway overpass would most likely be a ________ drafter. Architectural Process piping Civil Mechanical Architectural Process piping Civil Mechanical ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing This should show what changes were made, when, and by whom: Record of revisions Title form Revision drawings Portable document Record of revisions Title form Revision drawings Portable document ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing When drawing a line using the relative coordinate system a line is created from ________. The beginning point of the last line None of these 0, 0 The ending point of the last line The beginning point of the last line None of these 0, 0 The ending point of the last line ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Which of the following is one of the basic types of welded joints: T-joint Groove joint Rear joint Angle joint T-joint Groove joint Rear joint Angle joint ANSWER DOWNLOAD EXAMIANS APP