Generation of Electrical Energy Thermal efficiency of closed cycle gas turbine plant increases by All of these Regenerator Intercooling Reheating All of these Regenerator Intercooling Reheating ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy Diesel power plants are used as________plant. Stand by Base load None of these Peak load Stand by Base load None of these Peak load ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy The major heat loss in steam power plant occurs in Boiler None of these Superheater Condenser Boiler None of these Superheater Condenser ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy Rankine cycle operating on low pressure limit of p1 and high pressure limit of p2 Has lower thermal efficiency than Carnot cycle operating between same pressure limit May be more or less depending upon the magnitude of p1 and p2 Has same thermal efficiency as Carnot cycle operating between same pressure limits Has higher thermal efficiency than the Carnot cycle operating between same pressure limits Has lower thermal efficiency than Carnot cycle operating between same pressure limit May be more or less depending upon the magnitude of p1 and p2 Has same thermal efficiency as Carnot cycle operating between same pressure limits Has higher thermal efficiency than the Carnot cycle operating between same pressure limits ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy In a regenerative feed heating cycle, the optimum value of the fraction of steam extracted for feed heating Decreases with increase in Rankine cycle efficiency None of these Increases with increase in Rankine cycle efficiency Is unaffected by increase in Rankine cycle efficiency Decreases with increase in Rankine cycle efficiency None of these Increases with increase in Rankine cycle efficiency Is unaffected by increase in Rankine cycle efficiency ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy The capacity of the power plant is generally made _______ more than the maximum demand to meet the future load requirements. 55% to 60% 90% to 95% 15% to 20% 60% to 70% 55% to 60% 90% to 95% 15% to 20% 60% to 70% ANSWER DOWNLOAD EXAMIANS APP