GETCO Exam Paper (11-06-2017) There are _____ views on the issue of giving bonus to the employees independent adverse modest divergent independent adverse modest divergent ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In a 3-phase, 4-wire cable the cross sectional area of neutral conductor is equal to the area of phase conductor 1.5 times the area of phase conductor half of the area of phase conductor double the area of phase conductor equal to the area of phase conductor 1.5 times the area of phase conductor half of the area of phase conductor double the area of phase conductor ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Answer as per answer key provided is “double the area of phase conductor”. But neutral wire can be half of phase.
GETCO Exam Paper (11-06-2017) A power system needs injection of VARs at off-peak load full load peak load both peak and off-peak load off-peak load full load peak load both peak and off-peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Load shedding is done for power factor improvement reducing peak demand on the system repairing of machines efficient operation of equipment power factor improvement reducing peak demand on the system repairing of machines efficient operation of equipment ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Steady state stability of a power system is improved by reducing fault clearing time single pole switching using double circuit line instead of single circuit line decreasing generator inertia reducing fault clearing time single pole switching using double circuit line instead of single circuit line decreasing generator inertia ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The Mid Day meal scheme was launched on August 15, 2001 August 15, 1992 August 15, 2000 August 15, 1995 August 15, 2001 August 15, 1992 August 15, 2000 August 15, 1995 ANSWER DOWNLOAD EXAMIANS APP