GETCO Exam Paper (30-11-2008)

GETCO Exam Paper (30-11-2008)
The voltage regulation of a transformer at full load and 0.8 power factor lagging is 2.5%. The voltage regulation at full load, 0.8 power factor leading will be

-2.5%
2.5%
0.01
zero

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Which of the following inernational body is associated / collaborating in the National 'Population Education Programme' in the country?

UNFPA
IMF
UNESCO
WHO

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Which of the following regulation is considered to be the best

0.3
0.7
0.98
0.02

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The symmetrical components are used in fault analysis because

the sequence networks do not have mutual couplings
none of these
the result are in terms of symmetrical components
the number of equations become lesser

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The relay best suited for phase fault relaying for medium transmission line is

none of these
reactance relay
impedance relay
mho relay

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The planning Commission was set up in

March,1950
April, 1947
January, 1948
September, 1947

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (30-11-2008)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑