Switch Gear The transient voltage that appears across the contacts at the instant of arc extinction is called restriking voltage peak voltage supply voltage recovery voltage restriking voltage peak voltage supply voltage recovery voltage ANSWER DOWNLOAD EXAMIANS APP
Switch Gear Which of the following circuit breakers is prefered for EHT applications ? Sf6 CB air break circuit breaker low oil circuit breaker bulk oil circuit breaker Sf6 CB air break circuit breaker low oil circuit breaker bulk oil circuit breaker ANSWER DOWNLOAD EXAMIANS APP
Switch Gear The time of closing the cycle, in modern circuit breakers is 0.10 sec 0.003 sec 0.01 sec 0.001 sec 0.10 sec 0.003 sec 0.01 sec 0.001 sec ANSWER DOWNLOAD EXAMIANS APP
Switch Gear For the protection of power station buildings against direct strokes the requirements are interception interception, conduction and dissipation interception and conduction interception, conduction, dissipation and reflection None of these interception interception, conduction and dissipation interception and conduction interception, conduction, dissipation and reflection None of these ANSWER DOWNLOAD EXAMIANS APP
Switch Gear Back up protection is generally used for protection against short-circuit faults only None of these open-circuit faults only both open and short-circuit faults short-circuit faults only None of these open-circuit faults only both open and short-circuit faults ANSWER DOWNLOAD EXAMIANS APP
Switch Gear In a single bus-bar system there will be complete shut down when fault occurs with respect to earthing fault occurs on the bus itself fault occurs on neutral line two or more faults occur simultaneously fault occurs with respect to earthing fault occurs on the bus itself fault occurs on neutral line two or more faults occur simultaneously ANSWER DOWNLOAD EXAMIANS APP