DGVCL Exam Paper (12-06-2016) The time of closing the cycle, in modern circuit breakers is 0.001 sec. 0.1 sec. 0.003 sec. 0.01 sec. 0.001 sec. 0.1 sec. 0.003 sec. 0.01 sec. ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) In a transmission line if booster transformers are to be used, preferred location will be At the intermediate point At the sending end Anywhere in the line At the receiving end At the intermediate point At the sending end Anywhere in the line At the receiving end ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) Earthing switch is used for? Protection of equipment from ground faults All of these Measuring of safety voltage Discharging residual energies Protection of equipment from ground faults All of these Measuring of safety voltage Discharging residual energies ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) kWh meter is the electric meter that measures the amount of electrical _____ in kWh that was consumed in the house. Voltage None of these Current Energy Voltage None of these Current Energy ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) Which of the following circuit breakers has high reliability & minimum maintenance? Vacuum CB Air blast CB Bulk oil type CB Sulphur hexafluoride CB Vacuum CB Air blast CB Bulk oil type CB Sulphur hexafluoride CB ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) A _____ is used to measure the stator % winding temperature of the generator. Pyrometer Thermocouple Thermometer Resistance thermometer Pyrometer Thermocouple Thermometer Resistance thermometer ANSWER DOWNLOAD EXAMIANS APP