Process Control and Instrumentation The time constant of a unity gain, first order plus time delay process is 5 min. If the phase lag at a frequency of 0.2 rad/min is 60°, then the dead time (in minutes) is π/3 π/12 π/6 5π/12 π/3 π/12 π/6 5π/12 ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Sub-zero temperature (< 0°C) can be measured by a constant volume gas thermometer employing Helium Nitrogen None of these Hydrogen Helium Nitrogen None of these Hydrogen ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation In second order underdamped system, Large damping co-efficient means smaller damping Decay ratio = (overshoot)² Overshoot increases for increasing damping co-efficient Decay ratio = overshoot Large damping co-efficient means smaller damping Decay ratio = (overshoot)² Overshoot increases for increasing damping co-efficient Decay ratio = overshoot ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation What is the dynamic error in a critically damped second order instrument for a ramp input (AT)? 1.5 AT 0.5 AT 2 AT √AT 1.5 AT 0.5 AT 2 AT √AT ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Ordinary mercury in glass thermometer is used for measuring temperature upto 120°C. However, for measuring higher temperature upto __________ °C, thermometer is made by filling nitrogen under pressure above the mercury, which stops the evaporation of mercury and reduces the chance of broken thread of mercury. 350 700 550 250 350 700 550 250 ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Thermal wells are used in the temperature measurement to Increase the fidelity Guard against corrosive and oxidising action on thermocouple materials Reduce measuring lag Increase the sensitivity Increase the fidelity Guard against corrosive and oxidising action on thermocouple materials Reduce measuring lag Increase the sensitivity ANSWER DOWNLOAD EXAMIANS APP