Manufacturing And Production Technology The swing diameter over the bed is ________ the height of the centre measured from the bed of the lathe. One-half Thrice Twice Equal to One-half Thrice Twice Equal to ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology In drilling operation, the metal is removed by Shearing Extrusion Shearing and extrusion Shearing and compression Shearing Extrusion Shearing and extrusion Shearing and compression ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology When the cutting edge of the tool is dull, then during machining No chips are formed Continuous chips with built-up edge are formed Discontinuous chips are formed Continuous chips are formed No chips are formed Continuous chips with built-up edge are formed Discontinuous chips are formed Continuous chips are formed ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology A CNC vertical milling machine has to cut a straight slot of 10 mm width and 2 mm depth by a cutter of 10 mm diameter between points (0,0) and (100,100) on the XY plane (dimensions in mm). The feed rate used for milling is 50 mm/min, milling time for the slot (in seconds) is 180 120 240 170 180 120 240 170 ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology Internal gear cutting operation can be performed by Hobbing Shaping with pinion cutter Shaping with rack cutter Milling Hobbing Shaping with pinion cutter Shaping with rack cutter Milling ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology The cutting speed for drilling copper with high speed steel drills varies from 10 to 20 m/min 60 to 90 m/min 18 to 30 m/min 24 to 45 m/min 10 to 20 m/min 60 to 90 m/min 18 to 30 m/min 24 to 45 m/min ANSWER DOWNLOAD EXAMIANS APP