Engineering Drawing The standard number of threads per inch for various diameters is the: Major diameter Lead Thread pitch Series of thread Major diameter Lead Thread pitch Series of thread ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing In developing a multi-view drawing, the drafter can use a ________ line to help locate the top and right side views. Miter Dimension Object Hidden Miter Dimension Object Hidden ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing In this type of concrete, the steel is pre-tensioned before the superimposed load is applied: Reinforced Preloaded Pre-stressed Aggregate Reinforced Preloaded Pre-stressed Aggregate ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing When using the direct entry method to create a horizontal line exactly three inches long the drafter should ________ first. Insure that Ortho is on Pull the line from away from the starting point very carefully Enter 3 for the length of the line Read the coordinate position on the Dynamic Readout Insure that Ortho is on Pull the line from away from the starting point very carefully Enter 3 for the length of the line Read the coordinate position on the Dynamic Readout ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing This means that a feature of a finished product contains the maximum amount of material permitted by the tolerance dimensions for that feature: Machine mark indication Maximum machined indication Machined material condition Maximum material condition Machine mark indication Maximum machined indication Machined material condition Maximum material condition ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing When dimensioning piping drawings, you give the lengths of all runs of this type: Straight Transverse Angular Filleted Straight Transverse Angular Filleted ANSWER DOWNLOAD EXAMIANS APP