Nuclear Power Engineering The second underground nuclear test was conducted by India at Kalpakkan Pokhran Narora Jaisalmer Kalpakkan Pokhran Narora Jaisalmer ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering The half life period of a radioactive element depends on its Amount Pressure Temperature None of these Amount Pressure Temperature None of these ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering The amount of a radioisotope remaining undecayed after a time equal to four times its half life, will be __________ percent. 6.25 3.125 12.5 25 6.25 3.125 12.5 25 ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering In the nuclear reaction, 93N239 → 93Pu239 + ?; the missing particle is a/an Neutron Electron Proton Position Neutron Electron Proton Position ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering The main purpose of control rod in a nuclear reactor is to control the Conversion of fissile material into fertile material Velocity of the secondary neutrons Emission of hazardous radiation Chain reaction and hence the power output by regulating the number of secondary neutrons causing fission Conversion of fissile material into fertile material Velocity of the secondary neutrons Emission of hazardous radiation Chain reaction and hence the power output by regulating the number of secondary neutrons causing fission ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering The decrease in the atomic number is not observed in case of Electron capture Positron emission Β-emission Α-emission Electron capture Positron emission Β-emission Α-emission ANSWER DOWNLOAD EXAMIANS APP