Water Supply Engineering
The R.L. of ground water table on the sides of a valley is 1505 m whereas R.L. of the stream water is 1475 m. If 60° slope consists of pervious soil between R.L. 1485 m to 1500 m, the gravity spring may be expected at the point of reduced level

1475 m
1505 m
1485 m
1500 m

ANSWER DOWNLOAD EXAMIANS APP

Water Supply Engineering
Time of concentration

time taken for all the ran off to reach the drain
is the time taken, for precipitation
duration of rainfall.
time taken for the storm water to travel from the most remote point to the drain.

ANSWER DOWNLOAD EXAMIANS APP