Surveying The rise and fall method of levelling provides a complete check on All of these intermediate sight foresight backsight All of these intermediate sight foresight backsight ANSWER DOWNLOAD EXAMIANS APP
Surveying Check lines (or proof lines) in Chain Surveying, are essentially required To increase the out-turn To plot the offsets To indicate the accuracy of the survey work To plot the chain lines To increase the out-turn To plot the offsets To indicate the accuracy of the survey work To plot the chain lines ANSWER DOWNLOAD EXAMIANS APP
Surveying If two points differing by 1° of latitude and of the same longitude is 110 km apart on the earth, then two astronomical positions on the moon is about 10 km 50 km 30 km 25 km 10 km 50 km 30 km 25 km ANSWER DOWNLOAD EXAMIANS APP
Surveying If the reduced bearing of a line AB is N60°W and length is 100 m, then the latitude and departure respectively of the line AB will be +50 m, +86.6 m +50 m, -86.6 m +86.6 m, -50 m +70.7 m, -50 m +50 m, +86.6 m +50 m, -86.6 m +86.6 m, -50 m +70.7 m, -50 m ANSWER DOWNLOAD EXAMIANS APP
Surveying The prismatic compass and surveyor’s compass both give WCB of a line give whole circle bearing (WCB) of a line and quadrantal bearing (QB) of a line respectively both give QB of a line both give QB of a line and WCB of a line both give WCB of a line give whole circle bearing (WCB) of a line and quadrantal bearing (QB) of a line respectively both give QB of a line both give QB of a line and WCB of a line ANSWER DOWNLOAD EXAMIANS APP
Surveying If α is the observed altitude, the refraction correction in seconds, is 58 sin α 58" tan α 58 cos α 58" cot α 58 sin α 58" tan α 58 cos α 58" cot α ANSWER DOWNLOAD EXAMIANS APP