Surveying The rise and fall method is less accurate than height of instrument method is not suitable for levelling with tilting levels provides a check on the reduction of intermediate point levels quicker and less tedious for large number of intermediate sights is less accurate than height of instrument method is not suitable for levelling with tilting levels provides a check on the reduction of intermediate point levels quicker and less tedious for large number of intermediate sights ANSWER DOWNLOAD EXAMIANS APP
Surveying After fixing the plane table to the tripod, the main operations which are needed at each plane table station are(i) Levelling(ii) Orientation(iii) CenteringThe correct sequence of these operations is (i), (ii), (iii) (iii), (i), (ii) (i), (iii), (ii) (ii), (iii), (i) (i), (ii), (iii) (iii), (i), (ii) (i), (iii), (ii) (ii), (iii), (i) ANSWER DOWNLOAD EXAMIANS APP
Surveying International Date Line is located along Greenwich meridian Equator 180° longitude Standard meridian Greenwich meridian Equator 180° longitude Standard meridian ANSWER DOWNLOAD EXAMIANS APP
Surveying The scale of a tilted photograph of focal length f, taken from an altitude H, along the plate parallel through plumb point, is f/H sec θ f sec θ/H f/H f/H cos ½θ f/H sec θ f sec θ/H f/H f/H cos ½θ ANSWER DOWNLOAD EXAMIANS APP
Surveying The following sights are taken on a “turning point” foresight and intermediate sight foresight and backsight foresight only foresight only foresight and intermediate sight foresight and backsight foresight only foresight only ANSWER DOWNLOAD EXAMIANS APP
Surveying The process of determining the locations of the instrument station by drawing re sectors from the locations of the known stations is called intersection resection traversing radiation intersection resection traversing radiation ANSWER DOWNLOAD EXAMIANS APP