Environmental Engineering in CE The ratio of oxygen available to the oxygen required for stabilisation of sewage is called the Biological oxygen demand (BOD) Bacterial stability factor Relative stability Oxygen ion concentration Biological oxygen demand (BOD) Bacterial stability factor Relative stability Oxygen ion concentration ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE Iron & manganese present as pollutant in water can not be removed by Oxidation followed by settling & filtration Ion exchange process Chlorination Lime soda process or manganese zeolite process Oxidation followed by settling & filtration Ion exchange process Chlorination Lime soda process or manganese zeolite process ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE Exposure to SO₂ containing chimney gases results in the Increased drying & hardening time of paints All of these Acceleration of corrosion rates of metals Reduction in strength of leather & cloth Increased drying & hardening time of paints All of these Acceleration of corrosion rates of metals Reduction in strength of leather & cloth ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE __________ is the process of killing organism in water. Sterilisation Coagulation Disinfection Sedimentation Sterilisation Coagulation Disinfection Sedimentation ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE Fluorosis is caused due to the presence of excessive amount of __________ in drinking water. Arsenic Lead Fluoride Mercury Arsenic Lead Fluoride Mercury ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE Suspended solid present in the waste water generated in blast furnace gas cooling and cleaning plant is removed by Radial settling tank (thickener) using coagulant (lime & ferrous sulphate) Lagoons Biological oxygen pond Filtration Radial settling tank (thickener) using coagulant (lime & ferrous sulphate) Lagoons Biological oxygen pond Filtration ANSWER DOWNLOAD EXAMIANS APP