Environmental Engineering The ratio of 5 day BOD to ultimate BOD is about 1 43833 43864 43894 1 43833 43864 43894 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Assertion A: The consumption of water increases with increase in the distribution pressure.Reason R: Higher distribution pressure causes more loss and waste of waterSelect your answer according to the coding system given below Both A and R is true but R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is true but R is false A is false but R is true Both A and R is true but R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is true but R is false A is false but R is true ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Cleaning is done by (i) Scraping and removal in filters slow sand (ii) Back washing in slow sand filters (iii) Scraping and removal in filters rapid sand (iv) Back washing in rapid sand filters The correct answer is (i) and (ii) (ii) and (iii) (i) and (iv) (ii) and (iv) (i) and (ii) (ii) and (iii) (i) and (iv) (ii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Disinfection of water results in Removal of hardness Complete sterilisation Removal of turbidity Killing of disease bacteria Removal of hardness Complete sterilisation Removal of turbidity Killing of disease bacteria ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Period of cleaning of slow sand filters is about 24 - 48 hours 1 - 2 year 10 - 12 days 2 - 3 months 24 - 48 hours 1 - 2 year 10 - 12 days 2 - 3 months ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The method of analysis of distribution system in which the domestic supply is neglected and fire demand is considered is Circle method Equivalent pipe method Electrical analysis method Hardy cross method Circle method Equivalent pipe method Electrical analysis method Hardy cross method ANSWER DOWNLOAD EXAMIANS APP