Environmental Engineering The ratio of 5 day BOD to ultimate BOD is about 43864 43894 1 43833 43864 43894 1 43833 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Sewage treatment units are normally designed for 28 - 30 years 15 - 28 years 15 - 20 years 5 - 10 years 28 - 30 years 15 - 28 years 15 - 20 years 5 - 10 years ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The pathogens can be killed by Nitrification None of these Oxidation Chlorination Nitrification None of these Oxidation Chlorination ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Assertion A: The consumption of water increases with increase in the distribution pressure.Reason R: Higher distribution pressure causes more loss and waste of waterSelect your answer according to the coding system given below A is true but R is false Both A and R is true and R is the correct explanation of A A is false but R is true Both A and R is true but R is not the correct explanation of A A is true but R is false Both A and R is true and R is the correct explanation of A A is false but R is true Both A and R is true but R is not the correct explanation of A ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The settling velocity of a particle in a sedimentation tank depends on None of these Both depth and surface area of tank Surface area of tank Depth of tank None of these Both depth and surface area of tank Surface area of tank Depth of tank ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering If the average daily consumption of a city is 100,000 m³, the maximum daily consumption on peak hourly demand will be 150000 m³ 100000 m³ 180000 m³ 270000 m³ 150000 m³ 100000 m³ 180000 m³ 270000 m³ ANSWER DOWNLOAD EXAMIANS APP