Mechanical Operations The energy required per unit mass to grind limestone particles of very large size to 100 μm is 12.7 kWh/ton. An estimate (using Bond's law) of the energy to grind the particles from a very large size to 50 μrn is 25.4 kWh/ton 18 kWh/ton 6.35 kWh/ton 9.0 kWh/ton 25.4 kWh/ton 18 kWh/ton 6.35 kWh/ton 9.0 kWh/ton ANSWER DOWNLOAD EXAMIANS APP
Mechanical Operations Which of the following is a batch sedimentation equipment? Rotary sprayer scrubber Filter thickener Dust catcher Dry cyclone separator Rotary sprayer scrubber Filter thickener Dust catcher Dry cyclone separator ANSWER DOWNLOAD EXAMIANS APP
Mechanical Operations Separation of solid particles based on their densities is called Dispersion Sizing Sorting Clarification Dispersion Sizing Sorting Clarification ANSWER DOWNLOAD EXAMIANS APP
Mechanical Operations Metallic wire mesh is used as a filtering medium for the separation of dust from dust laden gas in case of a/an Air filter Bag filter Hydrocyclones Venturi scrubber Air filter Bag filter Hydrocyclones Venturi scrubber ANSWER DOWNLOAD EXAMIANS APP
Mechanical Operations Screw conveyors are Suitable for sticky materials Suitable for highly abrasive materials Run at very high rpm All of these Suitable for sticky materials Suitable for highly abrasive materials Run at very high rpm All of these ANSWER DOWNLOAD EXAMIANS APP
Mechanical Operations Filtration rate through a filter cake is proportional to (where, S = filtering surface R = specific cake resistance μ = viscosity of the filtrate) All of these S 1/R 1/μ All of these S 1/R 1/μ ANSWER DOWNLOAD EXAMIANS APP