Nuclear Power Engineering
The electric power generation cost in nuclear power plant is less than that in a coal based thermal power plant, mainly because the

None of these
Thermal efficiency of the former is higher
Maintenance cost of the former is less
Fuel cost per unit power generated is less

ANSWER DOWNLOAD EXAMIANS APP

Nuclear Power Engineering
The half life period of a radioactive substance is best determined by counting the number of alpha particles emitted per second in a Geiger Muller counter from its known quantity. If the half life period of a radioactive substance is one month, then

3/4th of it will disintegrate in two months
It will completely disintegrate in four months
It will completely disintegrate in two months
L/8th of it will remain intact at the end of four months

ANSWER DOWNLOAD EXAMIANS APP