Engineering Economics The depletion allowance method of computing depletion is commonly known as ______. Factor method Unit method Sinking fund method Percentage method Factor method Unit method Sinking fund method Percentage method ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics It is the practice of almost all banks in the Philippines that when they grant a loan, the interest for one year is automatically deducted from the principal amount upon release of money to a borrower. Let us therefore assume that you applied for a loan with a bank and the P80,000 was approved at an interest rate of 14% of which P11,200 was deducted and you were given a check of P68,800. Since you have to pay the amount of P80,000 one year after, what then will be the effective interest rate? 16.32 % 16.02 % 16.47 % 16.28 % 16.32 % 16.02 % 16.47 % 16.28 % ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What type of bond which can be redeemed before maturity date? Preferred bond Registered bond Callable bond Incorporators bond Preferred bond Registered bond Callable bond Incorporators bond ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics The first cost to be incurred if the piece of equipment now in place had been bought for a second hand dealer or some other business is called ______. Fixed cost In-place value Material cost First cost Fixed cost In-place value Material cost First cost ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What is a measure of the average speed with which accounts receivable are collected? Receivable turnover Quick ratio Acid test ratio Current ratio Receivable turnover Quick ratio Acid test ratio Current ratio ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics The ratio of the net income before taxes to net sales is called ______. Profit margin ratio Current ratio Price-earnings ratio Inventory turnover Profit margin ratio Current ratio Price-earnings ratio Inventory turnover ANSWER DOWNLOAD EXAMIANS APP