Structural Analysis The deformation of a spring produced by a unit load is called unit strain stiffness flexibility influence coefficient unit strain stiffness flexibility influence coefficient ANSWER DOWNLOAD EXAMIANS APP
Structural Analysis If there are m unknown member forces, r unknown reaction components and j number of joints, then the degree of static indeterminacy of a pin-jointed plane frame is given by m + r + 2j m + r – 2j m – r + 2j m + r – 3j m + r + 2j m + r – 2j m – r + 2j m + r – 3j ANSWER DOWNLOAD EXAMIANS APP
Structural Analysis If in a rigid-jointed space frame, (6m + r) < 6j, then the frame is Unstable Stable and statically determinate None of these Stable and statically indeterminate Unstable Stable and statically determinate None of these Stable and statically indeterminate ANSWER DOWNLOAD EXAMIANS APP
Structural Analysis If in a pin-jointed plane frame (m + r) > 2j, then the frame is(Where ‘m’ is number of members, ‘r’ is reaction components and ‘j’ is number of joints) None of these Stable and statically indeterminate Unstable Stable and statically determinate None of these Stable and statically indeterminate Unstable Stable and statically determinate ANSWER DOWNLOAD EXAMIANS APP
Structural Analysis When a load crosses a through type Pratt truss in the direction left to right, the nature of force in any diagonal member in the left half of the span would Always be tension Change from tension to compression Always be compression Change from compression to tension Always be tension Change from tension to compression Always be compression Change from compression to tension ANSWER DOWNLOAD EXAMIANS APP
Structural Analysis For under water concreting. All of these At least 10 percent more cement is required as compared to dry conditions The volume of coarse aggregates shall not be less than one and half times and not more than twice that of fine aggregate De-watering by pumping is not done or until 24 hours thereafter All of these At least 10 percent more cement is required as compared to dry conditions The volume of coarse aggregates shall not be less than one and half times and not more than twice that of fine aggregate De-watering by pumping is not done or until 24 hours thereafter ANSWER DOWNLOAD EXAMIANS APP