Surveying The point on the photograph where bisector between the vertical line through optical centre of the camera lens and the plate perpendicular meets, is known as Isocenter Plumb point Principal point Perspective centre Isocenter Plumb point Principal point Perspective centre ANSWER DOWNLOAD EXAMIANS APP
Surveying The two point problem and three point problem are methods of traversing orientation resection and orientation resection traversing orientation resection and orientation resection ANSWER DOWNLOAD EXAMIANS APP
Surveying Which of the following angles can be set out with the help of French cross staff? either 45° or 90° any angle 90° only 45° only either 45° or 90° any angle 90° only 45° only ANSWER DOWNLOAD EXAMIANS APP
Surveying Check lines (or proof lines) in Chain Surveying, are essentially required To increase the out-turn To plot the chain lines To indicate the accuracy of the survey work To plot the offsets To increase the out-turn To plot the chain lines To indicate the accuracy of the survey work To plot the offsets ANSWER DOWNLOAD EXAMIANS APP
Surveying A negative declination shows that the magnetic meridian is to the eastern side of the true meridian western side of the true meridian southern side of the true meridian None of these eastern side of the true meridian western side of the true meridian southern side of the true meridian None of these ANSWER DOWNLOAD EXAMIANS APP