Environmental Engineering Sewerage system is designed for Average flow only Maximum flow only Maximum and minimum flow Minimum flow only Average flow only Maximum flow only Maximum and minimum flow Minimum flow only ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Period of cleaning of slow sand filters is about 10 - 12 days 1 - 2 year 24 - 48 hours 2 - 3 months 10 - 12 days 1 - 2 year 24 - 48 hours 2 - 3 months ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering A sewer that receives the discharge of a number of house sewers is called House sewer Intercepting sewer Lateral sewer Sub-main sewer House sewer Intercepting sewer Lateral sewer Sub-main sewer ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The gas from sludge digestion tank is mainly composed of Hydrogen sulphide Methane Carbon dioxide Nitrogen Hydrogen sulphide Methane Carbon dioxide Nitrogen ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The detention period in coagulation tanks is usually kept as 2 to 6 days 30 to 45 minutes 2 to 6 hours 1 to 2 minutes 2 to 6 days 30 to 45 minutes 2 to 6 hours 1 to 2 minutes ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering If the coli form bacteria is present in a sample of water, then the coli-form test to be conducted is (i) Presumptive coli-form test (ii) Confirmed coli-form test (iii) Completed coli-form test All (i), (ii) and (iii) Only (i) Both (i) and (ii) Both (i) and (iii) All (i), (ii) and (iii) Only (i) Both (i) and (ii) Both (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP