Environmental Engineering Sewerage system is designed for Maximum and minimum flow Minimum flow only Average flow only Maximum flow only Maximum and minimum flow Minimum flow only Average flow only Maximum flow only ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The process in which the chlorination is done beyond the break point is known as Break point chlorination Post chlorination Pre-chlorination Super chlorination Break point chlorination Post chlorination Pre-chlorination Super chlorination ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering If the time of concentration is 9 minutes, then the intensity of rainfall according to British Ministry of Health formula will be 4 mm/hr 10 mm/hr 20 mm/hr 40 mm/hr 4 mm/hr 10 mm/hr 20 mm/hr 40 mm/hr ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The maximum discharge of a tube well is about 500 liters/sec 1000 liters/sec 50 liters/sec 5 liters/sec 500 liters/sec 1000 liters/sec 50 liters/sec 5 liters/sec ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Hardy cross method of analysis of distribution system (i) Involves successive trials (ii) Takes economic aspects into account (iii) Is time consuming (i) and (iii) Only (i) All are correct (i) and (ii) (i) and (iii) Only (i) All are correct (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering In facultative stabilization pond, the sewage is treated by Aerobic bacteria only Algae only Sedimentation Dual action of aerobic bacteria and anaerobic bacteria Aerobic bacteria only Algae only Sedimentation Dual action of aerobic bacteria and anaerobic bacteria ANSWER DOWNLOAD EXAMIANS APP