• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Environmental Engineering in CE

Environmental Engineering in CE
Removal of __________ is accomplished by aeration of water.

Dissolved solids
None of these
Dissolved gases
Suspended solids

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering in CE
The pH value of oxidised sewage is about

7.3
13.4
1.8
6.2

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering in CE
In a sedimentation tank, the detention period for water ranges from __________ hours.

24 to 32
16 to 20
2 to 4
8 to 12

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering in CE
Suspended solid present in the waste water generated in blast furnace gas cooling and cleaning plant is removed by

Lagoons
Filtration
Radial settling tank (thickener) using coagulant (lime & ferrous sulphate)
Biological oxygen pond

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering in CE
Oceans act as sinks for atmospheric gases including carbon dioxide whose concentration in the atmosphere is increased by the

Forestation
Green house effect
Rain
Vegetation

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering in CE
Water filtration rate in a rapid sand filter ranges from __________ kilolitres/m²/hr.

15 to 20
3 to 6
0.1 to 1
10 to 15

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Environmental Engineering in CE

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑