Environmental Engineering in CE Removal of __________ is accomplished by aeration of water. Suspended solids Dissolved solids Dissolved gases None of these Suspended solids Dissolved solids Dissolved gases None of these ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE In a sedimentation tank, the detention period for water ranges from __________ hours. 8 to 12 24 to 32 2 to 4 16 to 20 8 to 12 24 to 32 2 to 4 16 to 20 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE Most efficient and suitable dust removal equipment for removal of flyash from flue gas in a thermal power plant is the Cyclone separator Gravity settling chamber Electrostatic precipitator Bag filter Cyclone separator Gravity settling chamber Electrostatic precipitator Bag filter ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE Foul odour and bad taste of water is removed by treating with Activated carbon Bleaching powder Alum Copper sulphate Activated carbon Bleaching powder Alum Copper sulphate ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE TLV of NO₂ & NO exposure for the human being is 5 & 25 ppm respectively. Prolonged exposure of human being to NO₂ causes Cancer Bone disease Bronchitis Skin disorder Cancer Bone disease Bronchitis Skin disorder ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE Sulphur dioxide present in the industrial chimney exhaust gases causes Reduction in plant's productivity owing to acid rain Respiratory & lung disease All of these Corrosion of building materials Reduction in plant's productivity owing to acid rain Respiratory & lung disease All of these Corrosion of building materials ANSWER DOWNLOAD EXAMIANS APP