Power Systems Pump storage schemes are used to improve the diversity factor. the power factor. the plant capacity factor as well as the load factor of the power system. the load factor. the diversity factor. the power factor. the plant capacity factor as well as the load factor of the power system. the load factor. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 5. 3. 7. 20. 5. 3. 7. 20. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Gas coolled reactor use coolant at pressure of 14-28 Kg/cm2 and at temperature of 700°-800° c. use heavy water as coolant as well as moderator. use CO2. or helium as coolant and graphite the moderator. both B and C. use coolant at pressure of 14-28 Kg/cm2 and at temperature of 700°-800° c. use heavy water as coolant as well as moderator. use CO2. or helium as coolant and graphite the moderator. both B and C. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For loss less line, find the ratio of length to the wave length of a signal for a phase shift of 0.05 radians? 7.95 × 10-3 7.95 × 10³ 8 × 10³ 2 × 10-3 7.95 × 10-3 7.95 × 10³ 8 × 10³ 2 × 10-3 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠°90 Ω, C = 0.5*10^-6∠90° ℧. Find Charging current under no load? 1.144∠90° A/phase 0.144∠90° A/phase 0.512∠90° A/phase 0.344∠90° A/phase 1.144∠90° A/phase 0.144∠90° A/phase 0.512∠90° A/phase 0.344∠90° A/phase ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which turbine is ideally suited to pumped storage plants Francis. Kaplan. Pelton. Impeller. Francis. Kaplan. Pelton. Impeller. ANSWER DOWNLOAD EXAMIANS APP