Economics of Power Generation

Economics of Power Generation
______ public sector undertaking is associated with erection and sometimes running of thermal power plants.

BHEL
SAIL
BEL
NTPC

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
In a 3 phase system, the line losses are W at a p. f. Of 1 . If the power factor becomes 0.8 lagging, the losses will becomes

1.25 W
2 W
1.57 W
0.8 W

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
The depreciation charges in diminishing value method are

Heavy in later years
Same in all years
Light in early years
Heavy in early years

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
Depreciation charge are high in case of

Diesel plant
Hydroelectric plant
Diesel plant
Thermal plant

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
When the power factor improved, the kW capacity of alternator is

None of the listed here
Unaffected
Increased
Decreased

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
When power factor is improved, the lagging kVAR drawn from the supply will

Decrease
Remains same
None of the listed here
Increase

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Economics of Power Generation

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑