Economics of Power Generation ______ public sector undertaking is associated with erection and sometimes running of thermal power plants. SAIL BEL NTPC BHEL SAIL BEL NTPC BHEL ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Which of the following is an advantage of static capacitor for power factor improvement? Low losses All of the listed here Little maintenance cost Ease in installation Low losses All of the listed here Little maintenance cost Ease in installation ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The annual deposit is _____ in sinking fund method as compared to straight line method. None of the listed here The same Smaller Greater None of the listed here The same Smaller Greater ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Generating capacity connected to the bus bars and ready to take load when switched on is known as spinning reserve cold reserve firm power hot reserve spinning reserve cold reserve firm power hot reserve ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The correct relation in the following is : kVAR = kW cos Ф kVAR = kW tan Ф Not listed here kVAR = kW Sin Ф kVAR = kW cos Ф kVAR = kW tan Ф Not listed here kVAR = kW Sin Ф ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The area under load curve gives None of the listed here Maximum demand Average demand Energy consumed None of the listed here Maximum demand Average demand Energy consumed ANSWER DOWNLOAD EXAMIANS APP