Economics of Power Generation ______ public sector undertaking is associated with erection and sometimes running of thermal power plants. NTPC BEL SAIL BHEL NTPC BEL SAIL BHEL ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Generating capacity connected to the bus bars and ready to take load when switched on is known as firm power hot reserve spinning reserve cold reserve firm power hot reserve spinning reserve cold reserve ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation A load drwas active power(P), apparent power(S) and reactive power (Q) from the line. The power factor of the load is P/S Q/P P/Q S/P P/S Q/P P/Q S/P ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The depreciation of equipment is Less in early years More in early years Same every year None of the listed here Less in early years More in early years Same every year None of the listed here ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation A load draws a power of 10 kW at a power factor of 0.707 lagging. The lagging kVAR drawn from the supply will be 5 kVAR 15kVAR 20 kVAR 10 kVAR 5 kVAR 15kVAR 20 kVAR 10 kVAR ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The least share of power in provided in india, by which of the following power plants? Diesel power plant Thermal power plant Nuclear power plant Hydroelectric plant Diesel power plant Thermal power plant Nuclear power plant Hydroelectric plant ANSWER DOWNLOAD EXAMIANS APP