Economics of Power Generation ______ public sector undertaking is associated with erection and sometimes running of thermal power plants. SAIL BHEL NTPC BEL SAIL BHEL NTPC BEL ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The drawback of diminishing value method for calculating depreciation is that depreciation charges Are independent of rate of interest None of the listed here Are small in early years Are high in later years Are independent of rate of interest None of the listed here Are small in early years Are high in later years ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation A consumer who consumes more electrical energy should pay None of the listed here Less fixed charges per unit Less running charges per unit More fixed charges per unit None of the listed here Less fixed charges per unit Less running charges per unit More fixed charges per unit ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Load shedding is done to Repair the machine Reduce peak demand Run the equipment efficiency Improve power factor Repair the machine Reduce peak demand Run the equipment efficiency Improve power factor ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation High load factor indicates Total plant capacity is utilised for most of the time Total plant capacity is not properly utilised for most of the line Cost of generation per unit power is increased None of the listed here Total plant capacity is utilised for most of the time Total plant capacity is not properly utilised for most of the line Cost of generation per unit power is increased None of the listed here ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The correct relation in the following is : kVAR = kW tan Ф kVAR = kW cos Ф Not listed here kVAR = kW Sin Ф kVAR = kW tan Ф kVAR = kW cos Ф Not listed here kVAR = kW Sin Ф ANSWER DOWNLOAD EXAMIANS APP