Economics of Power Generation ______ public sector undertaking is associated with erection and sometimes running of thermal power plants. BEL SAIL BHEL NTPC BEL SAIL BHEL NTPC ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Which of the following is not a method for estimating depreciation charges? Sinking fund method Diminishing value method Halsey Straight line method Sinking fund method Diminishing value method Halsey Straight line method ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation An over excited synchronous motor on noload is known as induction motor synchronous condenser generator alternator induction motor synchronous condenser generator alternator ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation In a 3 phase system, the line losses are W at a p. f. Of 1 . If the power factor becomes 0.8 lagging, the losses will becomes 2 W 1.57 W 1.25 W 0.8 W 2 W 1.57 W 1.25 W 0.8 W ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Depreciation charge are high in case of Diesel plant Diesel plant Thermal plant Hydroelectric plant Diesel plant Diesel plant Thermal plant Hydroelectric plant ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation When the plant restors to load shedding it can be conclucted that Diversity factor is zero Plant is under repairs Daily load factor is unity Peak demand is more than the installed capacity Diversity factor is zero Plant is under repairs Daily load factor is unity Peak demand is more than the installed capacity ANSWER DOWNLOAD EXAMIANS APP