Economics of Power Generation ______ public sector undertaking is associated with erection and sometimes running of thermal power plants. NTPC SAIL BEL BHEL NTPC SAIL BEL BHEL ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation In a power plant if the maximum demand on the plant is equal to the plant capacity, then Plant reserve capacity will be zero Diversity factor will be unity Load factor will be unity Load factor will be nearly 60% Plant reserve capacity will be zero Diversity factor will be unity Load factor will be unity Load factor will be nearly 60% ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation If C is the capacitance per phase for delta connected capacitor bank, then capacitance per phase for star connected the capacitor bank is C/3 C/√3 3C √3C C/3 C/√3 3C √3C ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation For given active power and voltage, the current drawn is minimum when the value of power factor is 0.75 lag O. 8 lead 0.8 lag Unity 0.75 lag O. 8 lead 0.8 lag Unity ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation ________ is invariably used for peak load Steam turbine plant Nuclear power plant Pumped storage plant None of these Steam turbine plant Nuclear power plant Pumped storage plant None of these ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation In two part tariff, variation in load factor will affect None of the listed here Running charges Both running and fixed charges Fixed charges None of the listed here Running charges Both running and fixed charges Fixed charges ANSWER DOWNLOAD EXAMIANS APP