• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Economics of Power Generation

Economics of Power Generation
______ public sector undertaking is associated with erection and sometimes running of thermal power plants.

SAIL
NTPC
BHEL
BEL

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
The expected useful life of an hydroelectric power station is around

30 years
15 years
100 years
60 years

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
A consumer has to pay lesser fixed charges in

flat rate tariff
any of the above
maximum demand tariff
two part tariff

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
Improving the power factor means making it

Zero
Less than 0.5
None of the listed here
Close to unity

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
The annual deposit is _____ in sinking fund method as compared to straight line method.

The same
Smaller
None of the listed here
Greater

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
Load factor of a power station is generally

more than unity
equal to unity
less than unity
equal to zero Diversity factor is always

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Economics of Power Generation

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑