Economics of Power Generation

Economics of Power Generation
______ public sector undertaking is associated with erection and sometimes running of thermal power plants.

SAIL
BEL
NTPC
BHEL

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
Which of the following is an advantage of static capacitor for power factor improvement?

Low losses
All of the listed here
Little maintenance cost
Ease in installation

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
The annual deposit is _____ in sinking fund method as compared to straight line method.

None of the listed here
The same
Smaller
Greater

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
Generating capacity connected to the bus bars and ready to take load when switched on is known as

spinning reserve
cold reserve
firm power
hot reserve

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
The correct relation in the following is :

kVAR = kW cos Ф
kVAR = kW tan Ф
Not listed here
kVAR = kW Sin Ф

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
The area under load curve gives

None of the listed here
Maximum demand
Average demand
Energy consumed

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Economics of Power Generation

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑