Economics of Power Generation ______ public sector undertaking is associated with erection and sometimes running of thermal power plants. SAIL NTPC BEL BHEL SAIL NTPC BEL BHEL ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation High load factor indicates Cost of generation per unit power is increased Total plant capacity is utilised for most of the time None of the listed here Total plant capacity is not properly utilised for most of the line Cost of generation per unit power is increased Total plant capacity is utilised for most of the time None of the listed here Total plant capacity is not properly utilised for most of the line ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation In a 3 phase system, the line losses are W at a p. f. Of 1 . If the power factor becomes 0.8 lagging, the losses will becomes 0.8 W 1.25 W 1.57 W 2 W 0.8 W 1.25 W 1.57 W 2 W ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation For a diesel generating station the useful life is expected to be around 75 to 100 years 20 to 50 years 50 to 75 years 15 to 20 years 75 to 100 years 20 to 50 years 50 to 75 years 15 to 20 years ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation In two part tariff, variation in load factor will affect Fixed charges None of the listed here Both running and fixed charges Running charges Fixed charges None of the listed here Both running and fixed charges Running charges ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation ________ is invariably used for peak load None of these Nuclear power plant Steam turbine plant Pumped storage plant None of these Nuclear power plant Steam turbine plant Pumped storage plant ANSWER DOWNLOAD EXAMIANS APP