Economics of Power Generation ______ public sector undertaking is associated with erection and sometimes running of thermal power plants. SAIL NTPC BHEL BEL SAIL NTPC BHEL BEL ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The expected useful life of an hydroelectric power station is around 30 years 15 years 100 years 60 years 30 years 15 years 100 years 60 years ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation A consumer has to pay lesser fixed charges in flat rate tariff any of the above maximum demand tariff two part tariff flat rate tariff any of the above maximum demand tariff two part tariff ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Improving the power factor means making it Zero Less than 0.5 None of the listed here Close to unity Zero Less than 0.5 None of the listed here Close to unity ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The annual deposit is _____ in sinking fund method as compared to straight line method. The same Smaller None of the listed here Greater The same Smaller None of the listed here Greater ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Load factor of a power station is generally more than unity equal to unity less than unity equal to zero Diversity factor is always more than unity equal to unity less than unity equal to zero Diversity factor is always ANSWER DOWNLOAD EXAMIANS APP