Engineering Economics Present worth Annuity (PWA) is generally known as All of these Future annuities Income annuities Premium annuities All of these Future annuities Income annuities Premium annuities ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics The true value of interest rate computed by equations for compound interest for a 1 year period is known as ______. Effective interest Economic return Expected return Nominal interest Effective interest Economic return Expected return Nominal interest ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What is the ordinary interest on P1,500.50 for 182 days at 5.2%? P39.01 P39.82 P39.45 P39.99 P39.01 P39.82 P39.45 P39.99 ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What is normally used to compare alternatives that accomplish the same purpose but have unequal lives? Capitalized cost method MARR Present worth method Annual cost method Capitalized cost method MARR Present worth method Annual cost method ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics Both architect and engineer make use of the cost estimate of the project: For choosing alternatives For site selection All of these For designing of the project For choosing alternatives For site selection All of these For designing of the project ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics In a cash-flow diagram: Time 0 is considered to be the present A vertical arrow pointing up indicates a positive cash flow All of these Time 1 is considered to be the end of time period 1 Time 0 is considered to be the present A vertical arrow pointing up indicates a positive cash flow All of these Time 1 is considered to be the end of time period 1 ANSWER DOWNLOAD EXAMIANS APP