System Analysis and Design Positive testing is is checking the logic of one or more programs in the candidate system making sure that the new programs do in fact process certain transactions according to Specifications running the system with line data by the actual user testing changes made in an existing or a new program is checking the logic of one or more programs in the candidate system making sure that the new programs do in fact process certain transactions according to Specifications running the system with line data by the actual user testing changes made in an existing or a new program ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not a part of a Data Flow Diagram? None of these Data store arrow process represented by a bubble circle (circle) disk storage None of these Data store arrow process represented by a bubble circle (circle) disk storage ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following decides which systems development projects to work on first ? project dictionary None of these steering committee systems flowcharts data diagram project dictionary None of these steering committee systems flowcharts data diagram ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design A system design is said to be functionally modular if None of these the system is developed using structured programming through COBOL or PASCAL each module performs a specific function and can be developed relatively independently by programmers the system is able to handle all the function of the application the system makes extensive use of function. keys for maximum user assistance None of these the system is developed using structured programming through COBOL or PASCAL each module performs a specific function and can be developed relatively independently by programmers the system is able to handle all the function of the application the system makes extensive use of function. keys for maximum user assistance ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design A hierarchical chart that divides a large program into modules, in which greater details is designed in successively lower programming levels, is called a Structure All of these None of these sub-schema Scheme Structure All of these None of these sub-schema Scheme ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The model base cannot be prepared until both (a) and (b) the preparation of physical facilities the MIS staff has been acquired and organized None of these the computer has been selected both (a) and (b) the preparation of physical facilities the MIS staff has been acquired and organized None of these the computer has been selected ANSWER DOWNLOAD EXAMIANS APP