Automation System Plotter accuracy is measured in terms of repeatability and: buffer size None of these resolution vertical dimension intelligence buffer size None of these resolution vertical dimension intelligence ANSWER DOWNLOAD EXAMIANS APP
Automation System Which of the following editor(s) is(are) incorporated into general CAD system? None of these Line Editor Macro and symbol Editor All of these Point Editor None of these Line Editor Macro and symbol Editor All of these Point Editor ANSWER DOWNLOAD EXAMIANS APP
Automation System Use of modern control technology in automation systems: increases yield All of these None of these reduces costs improves reliability increases yield All of these None of these reduces costs improves reliability ANSWER DOWNLOAD EXAMIANS APP
Automation System The first industrial robot for commercial uses was installed in a Japanese plant at Toyota Automatic Loom Company, the parent company of the Toyota Automobile Group. When did this robot go into operation? None of these Dec-67 Apr-70 Jun-65 Nov-66 None of these Dec-67 Apr-70 Jun-65 Nov-66 ANSWER DOWNLOAD EXAMIANS APP
Automation System The formula for memory capacity is: MC = N squared. MC = N/2 MC = 2/N None of these MC -2 to the Nth power MC = N squared. MC = N/2 MC = 2/N None of these MC -2 to the Nth power ANSWER DOWNLOAD EXAMIANS APP
Automation System Four basic elements are required for an automated machine tool or production process. They are: input interface, memory, output interface and: logic NC tape programming None of these software computer graphics workstation logic NC tape programming None of these software computer graphics workstation ANSWER DOWNLOAD EXAMIANS APP