Automation System Plotter accuracy is measured in terms of repeatability and: resolution None of these intelligence buffer size vertical dimension resolution None of these intelligence buffer size vertical dimension ANSWER DOWNLOAD EXAMIANS APP
Automation System Which of these controller types is the most accurate? Proportional plus derivative Proportional Proportional plus integral None of these Three mode Proportional plus derivative Proportional Proportional plus integral None of these Three mode ANSWER DOWNLOAD EXAMIANS APP
Automation System Productivity is defined as: cost per unit number of items manufactured per day None of these output per man-hour of labour cost per day cost per unit number of items manufactured per day None of these output per man-hour of labour cost per day ANSWER DOWNLOAD EXAMIANS APP
Automation System Which method is frequently used, especially in the early stages of design? None of these The direct method All of these The design selection method The iterative design method None of these The direct method All of these The design selection method The iterative design method ANSWER DOWNLOAD EXAMIANS APP
Automation System For a type 0 system, the steady-state: None of these error for a step input is always zero input for acceleration input is always non-zero error for a velocity input is always zero (a) and (c) None of these error for a step input is always zero input for acceleration input is always non-zero error for a velocity input is always zero (a) and (c) ANSWER DOWNLOAD EXAMIANS APP
Automation System High-level languages: None of these are "procedure-oriented" require knowledge of the computer design are very difficult to use cannot be used with automatic systems. None of these are "procedure-oriented" require knowledge of the computer design are very difficult to use cannot be used with automatic systems. ANSWER DOWNLOAD EXAMIANS APP